Maximum control guarantee
We consider quality to be a fundamental element.
We pay the utmost attention to every minimum detail throughout the production cycle applying the highest quality standards in all stages.
CONSTRUCTION
From design to numerical control machining up to 5 axes
QUALITY CONTROL
Each element undergoes size verification with the issue of measurement reports
DECONTAMINATION
Food contact elements undergo pickling and passivation treatment to maximize hygiene standards.
ANALYSIS
We carry out controls on metal migration in accordance with food hygiene regulations
PACKAGING
We use packaging with sterile barriers to ensure the aseptic presentation of the product.
The following documentation is provided for each product delivered
• Compliance statement
• Measurement report
• Technical datasheet
TRANSPORT
Our logistics service guarantees delivery within 24-48 hours from the preparation of the goods.
Standard Production
Airlight™ technology allowed us to plan mass production of standard components to reduce costs and time. We have created parametric models that allow for quick matrix design.
Airlight™ dies have a modular structure consisting of two flanges, a ring and tubular ducts.
These components, especially the ring and tubular ducts, are commercial products that are subject to ASME (American Society Mechanical Engineers) regulations.